How long does it take to implement greenhouse transportation automation?
What Factors Stretch or Shorten the Timeline?
The biggest factors are project scope, site readiness, and decision speed. A single mobile conveyor can be delivered quickly, while a custom fixed line that links potting, buffering, and watering takes longer because it must be designed around your layout and production flow.
Several things typically influence how long a greenhouse transportation project runs:
- Scope: One conveyor or a full line of conveyors, buffer tables, and potting machines.
- Customization: Standard, combinable modules are faster than tailor-made solutions.
- Site conditions: Floor levels, available space, power supply, and existing equipment all affect preparation time.
- Decision speed: Quick sign-off on layouts and specifications keeps the schedule tight.
- Season: Planning around your peak periods avoids delays and stress on the shop floor.
Because we build our machines in our own workshop in De Lier, we keep production and delivery under our own control. That removes much of the waiting that comes with coordinating multiple suppliers.
What Are the Stages From First Idea to Running Line?
A typical project moves through five stages: an initial conversation about your bottlenecks, a process review and layout proposal, production of the equipment, installation on site, and fine-tuning after startup. Each stage builds on the previous one, so clear input early on speeds up everything that follows.
- Intake and process review: We look at where your labor goes and which handling steps cost the most time.
- Design and proposal: We translate your workflow into a layout, including which machines and conveyors fit.
- Production: The equipment is built in our own workshop, often from combinable standard components.
- Installation: Our team places, connects, and tests the system at your site.
- Optimization: After startup, we adjust speeds, buffering, and workstations based on real use.
Many growers are surprised by how much of the timeline sits in the first two stages. Taking a little extra time to map your process properly usually saves much more time later.
Can You Start Small With Mobile Conveyors First?
Yes, starting small with mobile conveyors is often the smartest route. Mobile greenhouse transportation equipment can be deployed within a short timeframe, needs minimal preparation, and lets you test the benefits in your own operation before committing to a larger fixed system.
This step-by-step approach also lowers the threshold for first-time automators. You can rent equipment during a busy period, see how it changes your daily work, and then decide what to add next. Many of our customers begin with one or two mobile transportbanden and gradually grow toward a permanent line.
The advantage is that your learning curve and your investment grow together. By the time you commit to a fixed installation, you already know exactly where it pays off.
How Long Does Installation Actually Take on Site?
On-site installation usually takes anywhere from a single day for mobile equipment to several days or weeks for a larger fixed system. The duration depends on the number of machines, the complexity of the layout, and how much groundwork your site needs beforehand.
Installation tends to be the shortest phase of the whole project, because the heavy lifting happens earlier. Our machines are built and tested in our workshop, so on site we mainly position, connect, and commission them. Since hardware, software, and installation all come from us, you do not need to coordinate between several parties or wait for one supplier to finish before the next can start.
Good preparation makes the biggest difference. Clear access, a level floor, and available power on installation day keep things moving without interruptions.
Can Production Keep Running During Implementation?
In most cases, yes. Production can largely continue during implementation, especially when the project is phased. Mobile equipment can run alongside your existing process, and fixed sections can be installed in stages or during quieter periods so your output is barely disrupted.
The key is planning. We look at your production calendar together and schedule the heaviest work outside your peak weeks. Working in phases also means your team can get used to new equipment gradually, rather than switching everything overnight. For a growing family business that cannot afford downtime, this approach keeps both the shop floor and the order book running smoothly.
How Quickly Do Growers See Labor Savings?
Many growers notice a difference almost immediately after a conveyor goes live, because less manual carrying and handling means fewer people are needed for the same task. The full effect builds as more steps of the internal transport process are automated.
The first gains usually appear in the most physically demanding tasks: moving trays and pots, buffering, and feeding potting lines. As you connect more steps, the savings compound. We have seen customers go from 26 to 6 FTEs for the same output after automating their internal transport step by step.
Beyond headcount, you also gain a more ergonomic workplace, lower absence due to heavy work, and less reliance on expensive temporary staff during peaks. That combination often matters as much as the direct wage savings.
Ready to find out what a realistic timeline looks like for your nursery? Get in touch with us and we will think it through with you, from the first mobile conveyor to a complete line.
Frequently Asked Questions
How do I know whether to start with a mobile conveyor or go straight to a fixed system?
Start by identifying where most of your manual handling time goes and how stable your layout is. If your workflow is still evolving, you’re automating for the first time, or you mainly need extra capacity during peaks, a mobile conveyor is a low-risk way to test the benefits. If your processes are well-defined and you handle high, consistent volumes, a fixed line designed around your layout may pay off sooner.
What should I prepare on my site before installation day?
Make sure there is clear access for delivery and installation, a level floor in the installation area, and a suitable power supply nearby. Also clear the work area of obstacles and confirm exact positions for conveyors, buffer tables, and workstations in advance. Sharing photos or a simple floor plan during the design stage helps catch issues early and avoids delays on the day.
What information should I gather before the first conversation to speed up the project?
Bring an overview of your current process: which handling steps take the most labor, your typical daily and peak volumes, tray or pot sizes, and a rough layout of the greenhouse or packing area. Knowing how many people work on each task and when your busiest weeks fall also helps. The more concrete your input, the faster the process review and layout proposal can be completed.
What are common mistakes that cause automation projects to run late?
The most frequent causes are slow sign-off on layouts, changing specifications after production has started, and underestimating site preparation such as power or floor levels. Scheduling installation during your peak season can also create delays because staff have less time to support the work. Mapping your process carefully up front and agreeing on a phased plan keeps the schedule realistic.
What if my needs change after the system is installed?
Because many components are combinable standard modules, you can usually expand or rearrange a line as your operation grows. The optimization phase after startup is also meant to adjust speeds, buffering, and workstations based on real-world use. If you anticipate growth, mention it during the design stage so the layout leaves room for future additions.
How can I prepare my team for new equipment so the labor savings show up faster?
Involve your employees early by explaining what will change and which heavy or repetitive tasks the equipment will take over. Plan a short training moment during commissioning so everyone knows how to operate and clean the machines safely. A phased rollout also lets your team get comfortable step by step, which helps you reach the full efficiency gains sooner.
How should I plan implementation around my peak season?
Aim to schedule design, production, and the heaviest installation work during your quieter months so the system is ready before the rush. If timing is tight, deploy a mobile conveyor or rental unit for the peak and install the fixed sections afterward. Discuss your production calendar at the start so the project timeline can be built around it.